Start Date: August 2014 Location: Guildford, Surrey New build of 4 bedroom detached house, following
Lingfield Road, Edenbridge | Construction of Two 3-Bedroom Semi-Detached Properties
Construction, Demolition, Groundworks, New Builds, Residential
Completion Date: February 2015 Location: Edenbridge, Kent Demolition of existing dwelling (took place in December 2013) and building of two new 3-bedroom (with en-suite) semi-detached properties with under-floor heating, ensuites in the master bedrooms and a rain harvesting system installed.
Guildford, Surrey | Extension and alterations to existing house
Alterations, Refurbishment, Residential
Start Date: August 2014 Location: Guildford, Surrey Extension and alterations carried out on existing house before new build of 4 bedroom detached house.
Burbage, Marlborough | Extension (2 bedrooms & bathroom)
Construction, Extension, Residential
Start Date: August 2014 Location: Burbage, Marlborough Extension works carried out to add 2 bedrooms and a bathroom above the existing garage.
Edenbridge, Kent | 2-Bedroom Extension
Construction, Extension, Groundworks, Refurbishment, Residential
Start Date: December 2013 Location: Edenbridge, Kent Building of 2 Bedroom Extension in Edenbridge. New central heating installation, electrical re-wire and new kitchen installation. Internal photos to follow...